国产乱国产乱老熟300部视频,欧洲秘 AV一区二区三区胖子,国产人妻人伦精品熟女A玄幻,婷婷五月天激情网

Operating procedures for gantry machining center

Date:03-20    Belong to:Company News
Operating procedures for gantry machining center - Check if all power switches, buttons, and function keys are normal - After entering the program flow, carefully check the CNC lathe machining code
Before starting, carry out a comprehensive and delicate inspection of the CNC lathe, including the control panel, slide surface, lathe chuck, lathe tool holder, tool table, CNC blade, etc. Only after confirming accuracy can actual operation be carried out< Br/>


1. After the CNC lathe is powered on, check whether all power switches, buttons, and function keys are normal and flexible, and whether there are any abnormal situations in the CNC lathe< Br/>


2. After entering the program flow, carefully check the CNC lathe machining code, detailed address, standard value, absolute value symbol, and decimal places< Br/>


3. Properly and accurately measure and calculate the plane coordinates of steel components. And conduct verification of personal income results& Amp; Nbsp& Middle; Type in the plane coordinates of the steel component and align the coordinates. Carefully check plane coordinates, absolute value symbols, and decimal places



4. Before installing the steel parts, conduct a program process by air freight to see if the program process can proceed smoothly, whether the installation of CNC blades and fixtures is effective, and whether there is a&quo; Overtravel< Br/>


5. When cutting, quickly fold the power switch and make sure to set it to the minimum gear< Br/>


6. When drilling down the tool, when the CNC blade operates to a distance of 30-50mm from the steel part, it is necessary to verify whether the remaining values of the Z-axis and X-axis coordinates are consistent with the production and processing program flow while maintaining the tool path< Br/>


7. In drilling and production processing, after cutting and replacing CNC blades, it is necessary to accurately measure the position of the CNC blade again and change the tool compensation value and number< Br/>


8. After making changes to the sequence, it is necessary to carefully verify some of the changes< Br/>


9. The CNC lathe can only be started after confirming the clamping of the steel parts. It is prohibited to accurately measure or touch the steel parts during rotation< Br/>


10. When there are abnormal phenomena such as steel parts shaking, shaking, abnormal noises, and loose fixtures during production, it is necessary to park the vehicle to solve them< Br/>


11. After emergency parking, the CNC lathe should be operated again; Return to Zero; Only through practical operation can the program process be operated again< Br/>
nine hundred
logo
Scan the QR code, follow the official account for more information

Contact:Mr.zhou

Mobile:13924586646

Telephone:0755-29423909

Email:sz_jdsk@163.com

Address:Bright new district of shenzhen hai westfield neighborhood community fourth industrial zone 6 area A house

Branch address: No. 199 Longshan Road, Ma'anshan Economic and Technological Development Zone/Office: No. 1399 Sufu Road, Xukou Town, Wuzhong District, Suzhou City, Jiangsu Province
Shenzhen carved CNC Equipment Co., Ltd. Copyright ICP 14057583 
无码人妻精品一区二区三区不卡 | 少妇水多A片太爽了 | 精品人妻久久久久一区二区三区 | 少妇熟女视频一区二区三区 | 欧美大肥婆大肥BBBBB | 亚洲一级Av无码毛片久久精品 | XXX亲子伦XXXinin | 女人18毛片AAA片水真多 | 中文人妻熟女乱又乱精品 | 国产一区二区三区在线视频 | 黃色毛片A片AAAA级 2 0 | 肉感肥臀一区二区三区 | 99国产精品人妻无码免费农村 | 91人妻无码一区二区三区 | 亚洲无码一区二区三区 | 波多野结衣高清无码 | 99久久久无码国产精品不卡男人 | 精品人妻伦一二三区蜜桃 | 精品人妻伦一二三区久久尼寺 | 午夜理理伦电影A片朋友夫妇 | 特级婬片A片AAA毛片爱奴 | 安徽妇搡BBBB搡BBBB袄爱直播 | A片成人18秘 免费接 | 欧美成人无码大胆A片软件蜜臀 | 91人妻人人澡人人爽人人有责 | 西西www444无码免费视频 | 91欧美精品成人AAA片 | 国产高清在线观看 | 少妇人妻一级A毛片无码 | 国产免费一区二区三区免费视频 | 嫩嫩BBBBBBBBB免费网站 | 丰满老熟女一级AA片色欲 | 亚洲精品在线视频 | 国产精品秘 一区二区入口九绯色 | 国产做a爱片久久毛片A片漫画 | 91精品无码少妇久久 | 天天躁日日躁狠狠躁喷水软件 | 安徽少妇BBBB搡BBBB | 96久久夜色精品国产九色杨思敏 | 丰满人妻被猛烈进入中文字幕 | 精品人妻一区二区三区午夜剧场 |